In line with the company’s new policy of handing over mines to the private sector, Iran’s mineral production and procurement company has invested 3 thousand billion rials in the private sector, and has handed over the preparations for the exploitation of Koh Dem gold mine to Perman Powish Project Management and Engineering Company. .
The plan to build a gold bar production plant with a capacity of at least 200 kg per year (in the first phase) is one of the production and exploitation plans in Koh Dem gold mine, and the production capacity will increase with the launch of the next phases.
With the activity of Koh Dam gold mine, in addition to boosting production and creating direct employment for more than 150 people, conditions will be provided for the development of the mine and factory as well as the exploitation of other mineral reserves in the region.
Currently, this company has started a major activity in this mine by equipping the workshop, carrying out initial designs, providing the required machinery and performing the first blasting operation to extract the mineral.
کافرما | شرکت تهیه و تولید مواد معدنی ایران |
---|---|
شماره قرارداد | 97/18796 |
نوع قرارداد | سرمایه گذاری |
محل اجرا | استان اصفهان شهرستان اردستان |
سال شروع قرارداد | 1397 |
مدت اولیه قرارداد | 13 سال |
تمدید قرارداد | *** |
پیمانکار/ پیمانکاران | شرکت مهندسی و خدمات مدیریت پرمان پویش |
مشاور | *** |
Perman Poish Engineering and management services company
© All rights reserved | Website design and SEO: Rahbar company