The hard reactor replacement project of Pars Industrial Carbon Black Company is as follows:
Hard reactor system including reactor, oil injection pumps, additive injection pump, oil preheater, air preheater, process air blower, quench tower along with scrubber vent will replace the current four reactors.
کافرما | شرکت دوده صنعتی پارس |
---|---|
شماره قرارداد | 1399/1/71594 |
نوع قرارداد | مدیر طرح-نظارت |
محل اجرا | استان تهران شهرستان ساوه شهرک صنعتی کاوه |
سال شروع قرارداد | 1399 |
مدت اولیه قرارداد | 24 ماه |
تمدید قرارداد | * ماه |
پیمانکار/ پیمانکاران | شرکت پاکمن |
مشاور | شرکت ماتریس |
Perman Poish Engineering and management services company
© All rights reserved | Website design and SEO: Rahbar company