The project of development and reconstruction of mining and complex leaching is defined as carrying out reconstruction and renovation projects of equipment, reducing production line stoppages, increasing the accessibility and efficiency of mining equipment, factories and equipment for concentration and leaching of Sarcheshme copper complex.
Performing technical and economic evaluation services of projects, selecting contractors/builders/sellers, holding tenders, basic and detailed design, purchasing engineering services, monitoring and workshop engineering services on all executive operations, commercial services during construction and final, planning and control services The consultant is responsible for the project, reviewing the situation and providing legal and contractual consulting services.
کارفرما | شرکت ملی صنایع مس ایران |
---|---|
شماره قرارداد | 20975769 |
نوع قرارداد | ارائه خدمات مشاوره |
محل اجرا | استان کرمان، مجتمع مس سرچشمه |
سال شروع قرارداد | 1398 |
مدت اولیه قرارداد | 36 ماه |
تمدید قرارداد | 12 ماه |
پیمانکار/یمانکاران | 1. شرکت کانی مس |
مشاور | شرکت مهندسی و خدمات مدیریت طرح پرمان پویش |
Perman Poish Engineering and management services company
© All rights reserved | Website design and SEO: Rahbar company