Carrying out the executive operation of upgrading the Midok sediment dam

Carrying out the executive operation of upgrading the Midok sediment dam

The promotion of the fourth stage of Midok Sedimentation Dam includes:

  1. Promotion of the main dam along with the implementation and promotion of the eastern bank
  2. Completion of Western Zinchei Dam
  3. Increasing the length of the dinket channel of the dam and also constructing the dinket channel of the western Zinche dam
  4. Construction of Zinche Dam Leakage Water Collection Facilities

Additional information

کافرما

شرکت ملی صنایع مس ایران

شماره قرارداد

4942

نوع قرارداد

پیمانکار C

محل اجرا

استان کرمان، مجتمع مس میدوک

سال شروع قرارداد

1393

مدت اولیه قرارداد

48 ماه

تمدید قرارداد

—-

پیمانکار/ پیمانکاران

مشارکت پرمان پویش و شرکت آسمانه

مشاور

شرکت آب و محیط خاورمیانه